The Reconstruction Project for the De Nieuwe Meer Interchange is part of the Zuidasdok program and focuses on improving traffic flow and accessibility of the A10 Zuid, a vital arterial road in Amsterdam. The interchange connects the A10 Zuid with the A4 and A10 West, playing a crucial role in the regional and national road network. The reconstruction includes various measures, such as lane expansions, the construction of new bridges over the Schinkel, and the separation of through and local traffic. This will not only increase capacity but also enhance traffic safety and the livability of the surrounding area.
Key Activities within the Project:
- Road Widening:
The A10 Zuid will be expanded from four to six lanes per direction, with separate lanes for through and local traffic. - New Infrastructure:
The construction of additional bridges and viaducts, including movable bridges over the Schinkel, to improve capacity and functionality. - Noise Reduction:
The use of quieter asphalt and the installation of additional noise barriers to minimize the impact on local residents.
The role of CI-Engineers:
- 3D Modeling:
We create detailed 3D models of the retaining structures, serving as the foundation for precise implementation designs. - Drawings and documentation:
Our technical drawings and documentation support construction and ensure a streamlined execution process. - Interdisciplinary collaboration:
We work closely with other disciplines to ensure our designs integrate seamlessly with other project components.
With our expertise, we contribute to safe and sustainable infrastructure, making the Amsterdam region even more accessible.